Soterra
Turning construction data into company intelligence.
soterra.co.nz
The problem

We keep paying to fix
the same mistakes.

$2.5B
the economic cost of defects in NZ residential construction, every year.
NZIER · NZ Institute of Economic Research
90%+
of NZ construction firms have hit project delays.
Statistics NZ
up to 30%
of construction work is rework, redoing what was already built.
Procore · industry research
soterra.co.nz02 / 09
The solution

One assistant, across
the whole build.

Learns

Soterra learns from its construction knowledge, your company's history and every project's documents. It remembers what happened on past jobs, so nothing is lost between projects.

Guides

Builds the QA checks that matter on this job and catches issues before work starts. It also drafts RFIs, reviews your H&S, programme and scopes, and answers any question cited to the source.

Prevents

Everything it does has one aim. The right knowledge reaches the site exactly when it's needed, so issues are caught before it's too late.

soterra.co.nz03 / 09
How it works

Three sources of knowledge. One private AI.

Soterra's knowledge
  • NZ Building Code & determinations
  • Manufacturer manuals
  • Industry best practice
Your company's history
  • Council inspections
  • Consultant inspections
  • Site reports
This project
  • Drawings & specifications
  • PS1s & producer statements
  • Shop drawings, schedules & scopes
Sealed to each company, a separate space per project. One company's data never reaches another, and never trains a shared model.
Manufacturers already part of the system
GIBCartersFuturebuildCHH TimberCHH PlyKingspanRondoRyanfireTrafalgar FireBOSS Fire
soterra.co.nz04 / 09
Potential impact · model on a $10M project

On a $10 million project, Soterra could prevent around $300,000 in direct rework.

rework exposure $10M × ~10% = $1,000,000
from recurring issues ~60% = $600,000
eliminate half of those → $300,000 saved / project
$10Mproject
Other project cost90%
Reworkup to 10%
Preventable with Soterra3% · ≈ $300,000
soterra.co.nz05 / 09
An example before the job

The wrong glass,
halfway in.

The plans and the façade PS1 didn't line up. The window contractor installed the wrong glazing off the architectural spec, and half of it was in before a façade inspection caught it.
▸ Soterra reads every document together, and flags the conflict before it's installed.
AssistantInspectionsDocumentsRFIsInsightsUpload
Kauri Tower
AD
Before we order the windows, can you check the drawings and PS1s for any clashes?
Reading the whole set…📐 From your plans

I read the whole set. One clash worth an RFI: the window schedule calls for 6.38mm laminated glass for the Level 3 windows, but the façade PS1 is designed on 10.38mm for the same units. The documents disagree, so I'd raise an RFI before anything's ordered. Want me to draft it?

2 sources · tap any to open
📐
A3-00-5200 · Window scheduleKauri Tower drawings · page 1 of 2
›
📐
PS1 · Façade design, glazingFaçade engineer · page 3 of 6
›
Ask about your plans, the Building Code, H&S or RFIs…
soterra.co.nz06 / 09
An example during the job

Same mistake.
Next site.

Site 1

TV nogs hidden in a corner of the plan. Missed. The floors below were already lined when the architect caught it, and it went in his inspection report.

Site 2

Same detail, missed again, and walls were cut open. The knowledge was already there, it just never made it to the next site.

▸ With Soterra, the knowledge carries from one site to the next, so the same mistakes stop repeating. In our research, more than 60% of issues were recurring.
AssistantInspectionsDocumentsRFIsInsightsUpload
Miro Lane
AD
Before we line the walls on Level 2, build me the pre-line check.
Building the check…📐 From your plans

No open CIs are relevant to the Level 2 linings. From your own history: the architect flagged missing TV nogs behind the lining at 42 Manuka Rd, your last job, so they're first on the list. The TV points are on the electrical plan. Get them in and marked before the GIB goes on.

📐
A3-00-7700 · Data & electrical plansMiro Lane drawings · page 2 of 4
›
Level 2 · Pre-line check14 checks · IPB · tap to open
📋
Ask about your plans, the Building Code, H&S or RFIs…
soterra.co.nz07 / 09
Defensibility

Our operating edge.

Company memory

Every job makes the next one smarter.

NZ knowledge

Code, councils and manufacturer manuals, with permission.

20 years on site, built in

It knows where the mistakes hide, because we've made them ourselves.

Why now: Proportionate liability is coming, and main contractors will carry more responsibility. Other tools digitise a checklist that might not even fit the site. Soterra writes it for you, from the plans, your history and the Code.
soterra.co.nz08 / 09
The team

Field experience,
engineering precision.

Soterra Team

On-site construction

20+ years in the New Zealand construction industry. We have lived the rework, the delays and the missed details first-hand.

AUT Team

Technology & AI

Auckland University of Technology engineers building the platform and the AI behind it.